 |
 |
 |
 |
 |
Abstraction |
|
The ability of engineers to think of design concepts that are not dependent on specific solutions. |
 |
 |
Boundary |
|
A separation between the interior of a system and what lies outside. |
 |
 |
Context |
|
The users, other systems and other features of the environment of the system that the system will interact with. |
 |
 |
Customer |
|
The organization or individual that has requested (and will pay for) a product or service. |
 |
 |
Engineering |
|
The application of scientific principles to practical ends. |
 |
 |
Feedback |
|
Information about the output of a system that can be used to adjust it. |
 |
 |
Gantt Chart |
|
A project management tool in the form of a bar chart showing the start and finish dates of activities. |
 |
 |
Input |
|
A material, service or support item that is processed by the system. |
 |
 |
Interdisciplinarity |
|
People from different disciplines working together to design systems. |
 |
 |
Lifecycle |
|
Important phases in the development of a system from initial concept through design, testing, use, maintenance, to retirement. |
 |
 |
Mission |
|
An undertaking that is supported by the system to be designed to be successful (e.g. space mission). |
 |
 |
Optimization |
|
The process of choosing the best alternative that will satisfy the needs of the stakeholders under the constraints given (e.g. cost, schedule and available technology). |
 |
 |
Output |
|
What is produced by a system. |
 |
 |
Process |
|
A set of activities used to convert inputs into desired outputs. |
 |
 |
Project |
|
An activity having goals, objectives, a beginning and an end. |
 |
 |
Requirement |
|
A statement of required behavior, performance and other characteristics of the system to be developed. |
 |
 |
Risk Management |
|
A process of identifying what can go wrong and making plans that will enable a system to achieve its goals. |
 |
 |
Specifications |
|
The technical requirements for systems design. |
 |
 |
Stakeholder |
|
An individual or group affected in some way by the undertaking. Stakeholders are valuable sources for requirements. |
 |
 |
System |
|
A set of interrelated components working together to produce a desired result. |
 |
 |
Systems Approach |
|
The application of a systematic disciplined engineering approach that considers the system as a whole, its impact on its environment and continues throughout the lifecycle of a project. |
 |
 |
System Design |
|
The identification of all the necessary components, their role, and how they have to interact for the system to fulfill its purpose. |
 |
 |
System Integration |
|
The activity of integrating all the components of a system to make sure they work together as intended. |
 |
 |
Systems Engineering |
|
The orderly process of bringing a system into being using a systems approach. |
 |
 |
Trade-off |
|
losing one quality or aspect of something in return for gaining another quality or aspect. |
 |
 |
Value |
|
The benefit enjoyed by the stakeholders of the system when the system is in operation. |
 |
 |
Validation |
|
Testing to insure that the created system actually provides the value intended to its stakeholders. (Did we build the right system?). |
 |
 |
Verification |
|
The process of proving that a finished product meets specifications and requirements. (Did we build the system right?) |